EMERGENCY FLOOD RESPONSE

East Burnside Before East Burnside After East Burnside During

During the 2015 Christmas holidays, following record breaking rainfall, we responded to an emergency call out in Cupar. A stone burn wall had collapsed, large volumes of water had rapidly eroded the bank to only 4 meters from a new residential development. Within hours, we had mobilised plant, equipment, materials and manpower to temporarily shore up the bank while a permanent scheme could be designed and agreed.  A couple of weeks later, we were asked to design and rebuild the permanent scheme.